Bharatmala pariyojana

The development of any nation depends on the transportation networks and the ways in which they are being maintained. The same holds true for the development of a huge and populous nation like India. For connecting the areas and maintaining smooth flow of traffic, the construction of new and developed roads are a must. The same will be achieved with the implementation of the Bharatmala project. Under the scheme, a host of new roads will be laid down in the nation.

Bharatmala Pariyojana is a new umbrella program for the highways sector that focuses on optimizing efficiency of freight and passenger movement across the country by bridging critical infrastructure gaps through effective interventions like development of Economic Corridors, Inter Corridors and Feeder Routes, National Corridor Efficiency Improvement, Border and International connectivity roads, Coastal and Port connectivity roads and Green-field expressways.

The announcement of the mammoth scheme was done by Shri Nitin Gadkari, in the presence of the Prime Minister Shri Narendra Modi. The implementation of a pan-nation scheme to improve the road network was the idea of the PM. All key aspects of the scheme will be managed by the Road Transport and Highways Ministry of the country.

HighlightsofBharatmalaPariyojana

Bharatmala Pariyojana
Improvement in efficiency of existing corridors through development of Multimodal Logistics Parks and elimination of choke point
Enhance focus on improving connectivity in North East and leveraging synergies with Inland Waterways
Emphasis on use of technology & scientific planning for Project Preparation and Asset Monitoring
Delegation of powers to expedite project delivery - Phase I to complete by 2022
Improving connectivity in the North East

KEY FEATURES OF THE SCHEME

Improving the quality of roads - 

The launch of the scheme has been done for bring a new wave of development in the nation in the form of well-maintained and developed roads. Under this project, the construction of roads, in all parts of the nation will be undertaken.

Total road construction -
 As per the draft of the scheme, government and the ministry will strive to complete new roads, which will add up to a whopping 34, 800 kms.

Integrated scheme - 
The Bharatmala is the name that is given to the road development and it will include many other related schemes as well. With the completion of all the schemes, the overall success of the scheme will be guaranteed.

Total tenure of the program -

The central government has the plans of finishing the scheme within a span of five years. Thus, all is set for finishing the first phase before the end of 2022.

Segmentation in phases - 

Due to the sheer magnitude and spread of the scheme, it will be divided into seven distinct phases. As of now, the first phase in under construction.

Constriction on a daily basis - 

To finish the first phase in time, the respective department has made efforts of constructing at least 18 km of path on a daily basis. To beat the clock, continued efforts are being made to raise it to 30 km/day.

Different categories of road construction - 

It has been highlighted in the official draft of the scheme that to provide better connectivity, the construction of various categories of roads will be undertaken.

Multi-source of finding -

 One source will not be enough for funding a mammoth project. Thus, the government will have to depend on other sources for generating adequate money to meet the expenses.

Budget AllocationBudget Allocation
A total of around 24,800 kms are being considered in Phase I of Bharatmala. In addition, Bharatmala Pariyojana phase -I also includes 10,000 kms of balance road works under NHDP, taking the total to 34,800 kms at an estimated cost of Rs.5,35,000 crore. Bharatmala Phase I - is to be implemented over a five years period of i.e. 2017-18 to 2021-22.


BHARATMALA PROJECT CATEGORY

Economic Corridor - As per the guidelines of the road construction project, the construction of 9000kms of Economic Corridors will be undertaken by the central government.

✓Feeder Route or Inter Corridor - 

The total length of the roads, which fall under the Feeder Route or Inter Corridor category, is a whopping 6000kms.
National Corridor Efficiency Improvement - 5000kms of roads, constructed under the scheme will fall in the category of National Corridor for the better connection between roads.
Border Road and International Connectivity - Connecting the cities and remote areas, which are situated in the border regions, the project has kept provision for constructing 2000kms roads that fall in the Border Road or International Connectivity category.

✓Port Connectivity and Coastal Road - 

To connect the areas that are dotted along the shorelines and important ports, the central government has ordered the construction of 2000km of roads.

✓Green Field Expressway - 

The main stress will be given on the construction and development of Green Field Expressway for better management of traffic and freight.

✓Balance NHDP Works - 

Under the last segment, the project will see a construction and maintenance of about 10,000kms of new roads.

Projects which are not part of Bharatmala Pariyojana Phase IBharatmala Pariyojana
If any such project is proposed by the State or is otherwise considered necessary and expedient to build including Ring Road or Bypass which is not part of the Bharatmala shelf of Projects; such a new project is to be taken up for consideration by MoRTH only if the State/Agency is ready to bear at least 50% cost of land acquisition. MoRTH will conduct a due consultation with Ministry of Finance and other concerned Departments/Ministries. The Grand Challenge mechanism would still apply for similar offers from more than one state/Agency.

BHARATMALA PARIYOJANA - PHASE-I

A. Program at a glance

✓I. Bharatmala Pariyojana is a new umbrella program for the highways sector that focuses
on optimizing efficiency of freight and passenger movement across the country by
bridging critical infrastructure gaps through effective interventions like development of
Economic Corridors, Inter Corridors and Feeder Routes, National Corridor
Efficiency Improvement, Border and International connectivity roads, Coastal and
Port connectivity roads and Green-field expressways. A total of around 24,800 kms
are being considered in Phase I. In addition, Phase I also includes 10,000 kms of balance
road works under NHDP. Estimated outlay for Phase I is Rs 5,35,000 crores spread over
5 years. The objective of the program is optimal resource allocation for a holistic
highway development/improvement initiative.

✓II. Effective delegation in appraisal /approval of individual project stretches and
encouraging State Governments to participate in the development process through „Grand
Challenge‟ are two distinguishing features of the program.

B. Background

✓I. The National Highways Development Program (NHDP) has reached a certain level of maturity. It is now important to re-define road development and have a macro approach  while planning expansion of the national highways network. The focus has to be on  recasting road development by bridging critical infrastructure gaps. 

✓II. Hence Bharatmala has been launched as a new umbrella program whose primary focus is on optimizing the efficiency of themovement of goods and people across the country.  This program envisages a corridor approach in place of the existing package-based  approach which has, in many cases, resulted in skewed development. For instance, in  areas of high traffic, even upto 30,000 Passenger Carrying Units (PCUs), there are NH  stretches of single and even intermediate lane. These have naturally become an  impediment to seamless freight and passenger movement. 

✓III. The NH Network and ongoing programs - India has about 54.82 lakh km of road
network, which is the second largest in the world in terms of length. National Highways
(NHs) constitute about 2% of the total road network, but carry about 40% of the total
road traffic.

✓IV. NHDP spread across Phase-I to VII is the most significant program taken up so far by
MoRTH. In addition, MoRTH is implementing other important programs like Special
Accelerated Road Development Program for North-Eastern Region (SARDP-NE) for
development of roads in the North East, and also the Left Wing Extremism (LWE)
Affected Area projects. Funding for these programs has been separately allocated. 
program of upgrading single-lane National Highways to at least two-lane with paved
shoulders through Externally Aided Projects (EAPs) is also being carried out. MoRTH is
also implementing a comprehensive bridge building program called “Setu Bharatam”
where 1,500 bridges and 208 Railway Over Bridges (ROB)s /Railway Under Bridges
(RUBs) are being taken up. Other ongoing programs of MoRTH are - a special package
for Jammu & Kashmir and NH(O).

✓V. NHDP had aggregate length of 55,792 kms. Out of this, 30,108 kms have been completed already and another 4,900 kms will be completed this year. The balance is 20,784 kms against which projects for 6,399 kms are under implementation. Of the remaining 14,385  kms, 4,385 kms are a part of Bharatmala Component like Corridors/Expressways.  Unfinished outstanding stretches of 10,000 kms will be subsumed in Bharatmala and  
implemented as an integrated program. The extensive experience gathered by MoRTH
and its implementing agencies like NHAI in implementing NHDP shall be utilized in
implementing Bharatmala.

C. Identification of project stretches under Bharatmala

✓I. Bharatmala focuses on enhanced effectiveness of already built infrastructure, multi–
modal integration, bridging infrastructure gaps for seamless movement and integrating
National and Economic Corridors. Identification of the project stretches under the
components of the proposed program has been done based on detailed O-D(Origin-
Destination) study, freight flow projections and verification of the identified
infrastructure gaps through geo mapping, using data from Bhaskaracharya Institute for
Space Applications and Geo-Informatics (BISAG) as well as from other sources. This O-
D study has also taken into account integration of economic corridors with the ongoing
projects under NHDP and infrastructure asymmetry in major corridors.

D. Bharatmala Phase I – components and outlay

✓I. As per the CCEA approval, Phase-I of Bharatmala shall be implemented over a period of five years 
=i.e. 2017-18 to 2021-22. Summary of Phase I components and approved outlay  
for the same are as follows:

Sl. No. 
Components Length -km Outlay -Rs crore

a. Economic corridors development 9,000 1,20,000

b. Inter-corridor & feeder roads 6,000 80,000

c. National Corridors Efficiency improvements: 5,000 100,000

d. Border & International connectivity roads 2,000 25,000

e. Coastal & port connectivity roads 2,000 20,000

f. Expressways 800 40,000
Total: 24,800 385,000
Balance road works under NHDP 10,000 1,50,000
Total 5,35,000

II. Components

a) Economic Corridors: - Identified Highways Corridors of Economic importance are
expected to carry 25% of freight in the coming years. Once built, the National and
Economic corridors along with their inter-corridor and feeder routes would be able to
carry 80% of our freight traffic. Around 26,200 km of Economic corridors have been
identified to be developed as Economic corridors out of which 9,000 kms are being taken up in Phase-I of Bharatmala. 

b) Inter-corridor and feeder roads to National and Economic Corridors: - Around 8,000
km of inter-corridor and around 7,500 km of feeder routes have been identified out of
which 6,000 kms are being taken up in Phase-I of Bharatmala.

c) National Corridors Efficiency Improvement: 

The Golden-Quadrilateral and NS-EW,
corridors carry 35% of India‟s freight and would be declared as National corridors. The
average traffic in the 6 national corridors is >30,000 PCU. The 6/8 laning of these
corridors would be done as per need. The National Corridors have developed choke points
impacting logistics efficiency. There is a requirement to build Ring Road and bypasses/
elevated corridors in addition to lane expansion to decongest these National Corridors.
Further, Logistics Parks would also be developed at strategic locations to enhance
logistics efficiency. A list of such identified locations of Logistics Parks is attached.
Around 5,000 kms are being taken up under this category in Phase-I of Bharatmala.

d) Border and International connectivity roads: - 

Around 3,300 km of border roads have
been identified to be built along the international border for their strategic importance.
Around 2,000 km of roads are required for connecting India‟s major highway corridor to
International trade points so as to facilitate Export-Import (EXIM) trade with our
neighbors: Nepal, Bhutan, Bangladesh and Myanmar. Around 2,000 kms are being taken
up under this category in Phase-I of Bharatmala.

e) Coastal and Port connectivity roads: - 

Around 2,100 km of coastal roads have been
identified to be built along the coast of India. These roads would boost both tourism and
industrial development of the coastal region. Around 2,000 km of port connectivity roads
have been identified to facilitate EXIM trade with an emphasis to improve connectivity to
non-major ports. The roads identified have been synergized with the Sagarmala program.
Around 2,000 kms are being taken up under this category in Phase-I of Bharatmala.

f) Green-field expressways-

 Certain sections of National and economic corridors have
traffic exceeding 50,000 PCUs and have also developed several choke points. About 1,900
km of these stretches have been identified for development of green-field expressways.
Around 800 kms are being taken up under this category in Phase-I of Bharatmala.

III. Minister -

RTH is authorized to substitute/replace up to 15% length of 24,800 kms for
Phase I of the program by other suitable projects, if development of certain identified
stretches under the program cannot be taken up on account of issues pertaining to
alignment finalization, land availability and other unforeseen factors. MoRTH shall retain
the same target and budget proposed above.

IV. In addition to Rs. 5,35,000 crore for Bharatmala Phase-I, 

there is a requirement of Rs.
1,57,324 crore for ongoing schemes like NH(O), SARDP-NE, EAP and LWE under
implementation in the Highways Sector. Thus, the overall outlay for Bharatmala and all
existing schemes put together will be Rs 6,92,324 crore over a period of 5 years.

V. Gross Budgetary Support for the Bharatmala program and existing schemes from 2017-
18 to 2021--22 will be restricted to Rs. 2,37,024 crore from Central Road Fund (CRF), Rs 59,973 crore as Budgetary support, Rs. 34,000 crore from expected monetization through  ToT route and Rs. 46,048 crore collected as Toll-Permanent Bridge Fee Fund (PBFF) by  NHAI. 

E. Appraisal and approval of projects under the program

I. Projects under Bharatmala Phase-I are to be implemented through NHAI, NHIDCL,
MoRTH and State PWDs.

II. All PPP BOT (Toll) projects, irrespective of the size and cost, where no grant (or VGF) is
given to the concessionaire and the construction and maintenance is financed by toll revenues are to be appraised and approved by the Board of NHAI. 

III. All PPP {BOT (Annuity) or BOT (HAM)} projects costing upto Rs. 2000 crore (TPC
excluding land cost) are to be appraised by the SFC chaired by Secretary, MoRTH and
approved by Minister (MoRTH).

IV. All PPP {BOT (Annuity) or BOT (HAM)} projects costing more than Rs. 2000 crore
(TPC excluding land cost) are to be appraised by PPPAC chaired by Secretary, DEA and
approved by CCEA.

V. All PPP projects, which need VGF grants from Government, are to be appraised and
approved as per extant guidelines of DEA applicable for VGF support.

VI. All EPC projects implemented by NHAI under this program are to be approved by NHAI Board after proper appraisal, within the budgeted financial resources approved under this  program. 

VII. Further, NHAI Board is authorized to suitably delegate its powers on appraisal and
approval of projects within NHAI.

VIII. For EPC projects to be implemented by MoRTH through State PWDs or other agencies, the extant mechanism is to be followed
 i.e. all projects having civil cost (TPC excluding  land cost) between Rs 100 crore to Rs 1,000 crore are to be appraised by the DIB, chaired  by Secretary (RT&H), and approved by the Minister (RT&H), while projects having civil  costs beyond Rs 1000 crore (TPC excluding land cost) are to be be appraised by the PIB  chaired by FS &Secretary, Expenditure and approved by CCEA. 

IX. For projects to be implemented by NHIDCL in the North-East, the appraisal and approval
mechanism is to be the same as that applicable for projects under ongoing SARDP-NE programs
 i.e., through the High Powered Committee (HPC) under the chairmanship of  
Secretary (RT&H).

X. All decisions of change of mode of execution are to be taken by the Board of NHAI or MoRTH, for their respective roads, subject to availability of funds and other required  conditions. 

XI. Individual Projects under the program that involve Revised Cost Estimates are to be
considered and approved by the Concerned Authority which has accorded approval to the
project as per the above guidelines, subject to the cumulative financial commitments of
all such projects being within the allocation approved for this program.

XII. All projects implemented under the program, either by NHAI or MoRTH, are to be
technically, financially and economically appraised duly by an empowered and well-
equipped Project Appraisal &Technical Scrutiny Committee to be setup in NHAI and
MoRTH. The Project Appraisal &Technical Scrutiny Committee for appraising projects
under Bharatmala Pariyojana would comprise experts from NITI Aayog, Project and
Finance Division and would be a dedicated unit which would place its recommendations
on appraisal of projects to NHAI Board or Secretary, MoRTH, as the case may be, for
approval.

       (a) Composition of the Project Appraisal &Technical Scrutiny mechanism is to be
decided and approved by the NHAI Board (Authority).
       (b) Composition of the Project Appraisal &Technical Scrutiny Committee at MoRTH -
existing PPP Cell under Highways Wing is to continue with reinforcement through
addition of Financial Consultant and such other experts as may be required. As per
extant mechanism, the PPP Cell solicits views/comments of NITI Aayog on project
proposals.
XIII. State Governments are to be requested not to levy any such administrative costs for land
acquisition or charge the actual expenditure incurred in the process or, in the alternative,
an amount not exceeding 2.5% of the compensation amount. Similarly, State
Governments are to be requested that supervision charges for utility shifting should also be capped at 2.5% of the approved estimates.XIV. Guidelines for scrutiny of individual projects which are to be followed by all  implementing agencies are at Annexure A.  F. Grand Challenge mechanism 
I. Within the Bharatmala Pariyojana, 10% funds are to be kept earmarked to take up
projects under the „Grand Challenge‟ mechanism on reducing balance basis vis-à-vis
annual fund allocation for the Bharatmala Pariyojana to take up projects on fast track
basis where sufficient and timely land is made available by the State Government as per
norms of MoRTH.

a) Under the Grand Challenge Mechanism, a maximum of two stretches of roads not
exceeding 100 kms are to be allowed from any one State in a particular financial year.

b) States are to indicate their preference for a stretch from the final list of the roads
included in the Bharatmala Pariyojana in the month of April every year.

c) Once such an intention has been shown by a State, MoRTH will send a preliminary
confirmation to the particular state and proceed to finalize the alignment and prepare the DPR. 

d) If a State has acquired 50% of the land by the time the DPR is ready, then such DPRs
will be put on fast track mode and MoRTH will send secondary confirmation to State
Government.

e) From amongst such DPRs/projects, those projects are to be taken up for bidding where
additional 30% of the land is acquired by the time of bidding of the projects.

f) From such successful bids, those projects are to be awarded where 90% land has already been acquired at the time of award of the project. 

g) If the above milestone is satisfied, the implementation of the said project in the said
State will be taken on priority.

h) If there are competing projects with the above credentials, then those projects which are connecting to Ports and/or Industrial or commercial hubs and other economically and  strategically important locations are to be given priority. 

i) In addition, if the concerned State Government provides at least 25% of the Land Acquisition cost for „Ring Road or Bypass‟ projects, already included in the program,  such projects will be taken up for construction by NHAI on priority basis. 

j) After the award of the road project, if there is no progress in the said project for one
year on account of RoW issues including availability of land, utility shifting/tree felling
issues, encroachment issues etc, then the said allocation of funds for the said project willstand cancelled on the expiry of one year.
  
G. Projects which are not part of Bharatmala Pariyojana Phase I

If any such project is proposed by the State or is otherwise considered necessary and
expedient to build including Ring Road or Bypass which is not part of the Bharatmala
shelf of Projects; such a new project is to be taken up for consideration by MoRTH
only if the State/Agency is ready to bear at least 50% cost of land acquisition. MoRTH
will conduct a due consultation with Ministry of Finance and other concerned
Departments/Ministries. The Grand Challenge mechanism would still apply for similar
offers from more than one State/Agency.
H. Expansion of NHAI Board (Authority)
NHAI Board (Authority) is to be expanded to include CEO, NITI Aayog as a part-time
member. Now, the part-time members of the Board will include the following:-

i. Secretary, Department of Expenditure
ii. CEO, NITI Aayog
iii. Secretary, Ministry of Road Transport and Highways
iv. Director General (RD) & Special Secretary, MoRTH
I. Criteria for selection of corridors
Selection criteria for projects to be taken up under Bharatmala Phase-I are to be as
follows: -
Sl. No. 
Component of Bharatmala
Pariyojana
Inter-se priority determination criteria for selection
of stretches
1 Economic Corridor
Development
Economic corridor development program focuses on
developing new corridors, in addition to existing
Golden Quadrilateral (GQ) and North South-East
West corridors (NS-EW). It is planned to develop
these corridors end to end to ensure seamless and
speedy travel and to ensure uniformity in standards in
terms of speed, design of various elements of roads,
control of accesses, way side amenities, road safety
features, etc. Once upgraded it will ensure substantial
increase in speed and time of travel for both freight
and passenger traffic at large across the country.
Criteria:
 Stretches with higher freight flow;
 Stretches with overall higher traffic;
 Stretches with ease of Land Acquisition and pre
Sl.
No.
Component of Bharatmala
Pariyojana
Inter-se priority determination criteria for selection
of stretches
construction activities and DPR preparation;
 Capacity augmentation from 4 to 6 lane would be
taken in 2nd phase.
2 Inter Corridor and feeder
roads development
Stretches of roads connecting more than 2 corridors
are classified as inter-corridors routes, while other
routes connecting to 1 or 2 corridors are termed as
feeder routes.
Selection Criteria:
 Stretches with less than 4 lane infrastructure leading
to infrastructure asymmetry on the corridor;
 Higher traffic in terms of PCU;
 Stretches with ease of Land Acquisition and pre-
construction activities and DPR preparation.
3 National Corridors
Efficiency Improvement
National Corridor Efficiency Improvement program
will focus on improving the efficiency of the existing
corridors (GQ and NS-EW), by removing the
congestion points on the corridor to improve the
average speed on the corridor. Interventions such as
controlling access on the corridor, uniform corridor
tolling, development of bypasses, ring roads, fly overs
at choke points will be taken up to improve the
average speed on the existing corridors in line with the
best in class corridors.
Criteria:
 Congestion records;
 Road safety consideration
 Higher traffic would be prioritized;
 Focus on Ring roads; mobilization/acquisition of
land by State Governments
 Connectivity of Logistics Parks
4 Border and International
connectivity roads
Criteria:
 Synergy with development of Integrated check post,
 Government priority; IMT/BIN/BIMSTEC MVAs
 Stretches of ease of Land Acquisition and pre-
construction activities and DPR preparation
5 Coastal and Port
connectivity roads
Criteria:
 Development status of Ports;
 Equity participation by Stake holders;
Sl.
No.
Component of Bharatmala
Pariyojana
Inter-se priority determination criteria for selection
of stretches
 Synchronization with other port development under
Sagarmala;
 Ease of Land Acquisition and pre-construction
activities and DPR preparation.
6. Expressways Criteria:
 Constraint in capacity augmentation of important
NHs where PCU > 50,000;
 Higher traffic would be prioritized;
 Synchronization with rapidly growing Industrial
activities;
 Stretches with ease of Land Acquisition and pre-
construction activities and DPR preparation.
J. Encouraging PPP in implementation of projects
An amount of Rs. 60,000 crore of private investment is planned to be sourced in Phase-I
of the program through PPP. All endeavors shall be made by MoRTH / NHAI to ensure
that projects under the program are taken up through PPP model to the extent proposed.
The Toll-Operate-Transfer (ToT) model shall be used to monetize all roads constructed
through EPC route.
K. Project Duration & Management
I. All efforts shall be made to ensure that award of all projects under Phase-I of Bharatmala
Pariyojana is completed in next two years.
II. The project shall be completed in a period of 5 years from the date of sanction. Planning
and implementation shall be meticulously done so as to minimize scope for cost and time
overruns.
L. Monitoring & Audit Mechanism
I. PIB will review the progress of this program once in 6 months with a view to avoid cost
and time overruns. MoRTH in consultation with NHAI and NHIDCL should bring out a
consolidated Progress Report for all sub-projects contained in the approved Bharatmala
Phase-I to the PIB (every December and June). The Progress Report should include
details of the variation in the parameters of the sub-projects, which increase the overall
cost of the sub-projects or their financing patterns. Along with project progress, PIB will
also review raising of funds, revenue generation and debt servicing aspects.
II. The Progress Report along with the Review Report of the PIB shall be placed before the
CCEA and its guidance shall be obtained.
III. Outcome parameters like reduction in time of travel, fuel efficiency, accident reduction,
ride comfort and user satisfaction may be laid down and monitored periodically for every
corridor.
IV. Audit of physical and technical parameters will be ensured for all such projects by
MoRTH by appropriate independent agencies.
M. Employment generation opportunity
I. Development of projects/sub projects under the umbrella program would generate
substantive employment opportunities across the country. It has been estimated that more
than 10 crore mandays shall be generated from Phase I of the program.
N. Program Impact
I. The program once implemented shall optimize the efficiency of traffic movement on
roads across the country through adoption of a coherent corridor approach. It shall also
ensure timely completion of high priority projects in a focused manner.
II. The program shall enable to connect 550 Districts in the country through NH linkages.
Currently, around 300 Districts have NH linkages.
III. The program shall have a positive impact on the Logistic Performance Index (LPI) of the country.